Pacific VP120DA Double Action Door Set -/120/60 Installation

 

This tool is designed to filter the available results as you search. Once you have applied a filter, you may need to reset the filter to be able to see all other available options.

To see our installation videos please click here.

Installation wall framing requirements

Pacific VP120DA Double Action Door Set -/120/60

WALL TYPE: Timber stud
FRAME TYPE: Steel, 1-part

Frame materials available:

  • EGZ - 1.6mm
  • Cold rolled galvanized - 1.6mm
  • Stainless Steel - 1.5mm (VP30-60DA only)

Fasteners:

  • Folded steel connection plates (as shown) to be supplied with frames.
  • Hook onto frame bracing straps and nail or screw to timber studs.
  • Frame connection plates either clouts (30 x 2.5mm gib clouts) or screw fixed.

Head Fixing (minimum):

  • Single door - none required
  • Paired door - single central fixing required

Stud size:

  • Ex 100x50mm minimum

Wedging gap:

  • Not applicable

Insulation rating:

To obtain an insulation rating, the steel frame must be packed with either;

  • Plasterboard (30 minutes)
  • Ceramic fibre blanket (30 minutes)
  • Cornice plaster (30 minutes)
  • Grout (60 minutes)
  • Pyropanel M4 mortar (60 minutes)

No frame packing equals no insulation rating (i.e. -/xx/-)

F-D-VP30-120DA-S-T-1 image
WALL TYPE: Timber stud
FRAME TYPE: Steel, 1-part

Frame materials available:

  • EGZ - 1.6mm
  • Cold rolled galvanized - 1.6mm
  • Stainless Steel - 1.5mm (VP30-60DA only)

Fasteners:

  • Framing stud No.1 screwed to jamb.
  • Connection to stud No.2 via rebated nail on plates. One fastener per location except at bottom where two fasteners are required.
  • Frame to be screw fixed (10g self tapping) at 600mm centres nominal. Two fasteners per location where applicable.

Head Fixing (minimum):

  • Single door - none required
  • Paired door - double central fastener required

Stud size:

  • Ex 100x50mm minimum

Wedging gap:

  • Not applicable

Insulation rating:

To obtain an insulation rating, the steel frame must be packed with either;

  • Plasterboard (30 minutes)
  • Ceramic fibre blanket (30 minutes)
  • Cornice plaster (30 minutes)
  • Grout (60 minutes)
  • Pyropanel M4 mortar (60 minutes)

No frame packing equals no insulation rating (i.e. -/xx/-)

F-D-VP30-120DA-S-T-2 image
WALL TYPE: Timber stud
FRAME TYPE: Steel, 1-part

Frame materials available:

  • EGZ - 1.6mm
  • Cold rolled galvanized - 1.6mm
  • Stainless Steel - 1.5mm (VP30-60DA ONLY)

Fasteners:

  • Frame screwed to stud through Gib Fyreline packing between stud and shims.
  • Frame to be screw fixed (10g self tapping) at 600mm centres nominal. Two fasteners per location where applicable.

Head Fixing (minimum):

  • Single door - none required
  • Paired door - double central fastener required

Stud size:

  • Ex 100x50mm minimum

Wedging gap:

  • 0-10mm

Insulation rating:

To obtain an insulation rating, the steel frame must be packed with either;

  • Plasterboard (30 minutes)
  • Ceramic fibre blanket (30 minutes)
  • Cornice plaster (30 minutes)
  • Grout (60 minutes)
  • Pyropanel M4 mortar (60 minutes)

No frame packing equals no insulation rating (i.e. -/xx/-)

F-D-VP30-120DA-S-T-3 image
WALL TYPE: Timber stud
FRAME TYPE: Steel, 1-part

Frame materials available:

  • EGZ - 1.6mm
  • Cold rolled galvanized - 1.6mm
  • Stainless Steel - 1.5mm (VP30-60 ONLY)

Fasteners:

  • Frames may be screwed directly to studs either through the stud and into the frame bracing straps or through the frame into the timber stud at 600mm centres nominal.
  • Frame to be screw fixed (10g self tapping) at 600mm centres nominal. Two fasteners per location where applicable.

Head Fixing (minimum):

  • Single door - none required
  • Paired door - double central fastener required

Stud size:

  • Ex 100x50mm minimum

Wedging gap:

  • Not applicable

Insulation rating:

To obtain an insulation rating, the steel frame must be packed with either;

  • Plasterboard (30 minutes)
  • Ceramic fibre blanket (30 minutes)
  • Cornice plaster (30 minutes)
  • Grout (60 minutes)
  • Pyropanel M4 mortar (60 minutes)

No frame packing equals no insulation rating (i.e. -/xx/-)

F-D-VP30-120DA-S-T-4 image
WALL TYPE: Masonry
FRAME TYPE: Steel, 1-part

Frame materials available:

  • EGZ - 1.6mm
  • Cold rolled galvanized - 1.6mm
  • Stainless Steel - 1.5mm (VP120DA Must be fully grouted frame)

Fasteners:

  • Jamb fixing at 600mm centres nominal
  • Expansion anchors eg. M10 countersunk 'Ramset' Dynabolts
  • M12 countersunk masonry screwbolts

Head Fixing (minimum):

  • Single door - none required
  • Paired door - single central fastener required

Wedging Gap:

  • 0-15mm

Insulation rating:

To obtain an insulation rating, the steel frame must be packed with either;

  • Plasterboard (30 minutes)
  • Ceramic fibre blanket (30 minutes)
  • Cornice plaster (30 minutes)
  • Grout (60 minutes)
  • Pyropanel M4 mortar (60 minutes)

No frame packing equals no insulation rating (i.e. -/xx/-)

F-D-VP30-120DA-S-M-1 image
WALL TYPE: Steel stud
FRAME TYPE: Steel, 1-part

Frame materials available:

  • EGZ - 1.6mm
  • Cold rolled galvanized - 1.6mm
  • Stainless Steel - 1.5mm (VP30 & 60 ONLY)

Fasteners:

  • Boxed stud riveted with steel pop rivets or screwed with self tapping screws to frame bracing straps at 600mm centres minimum.
  • Steel studs may be riveted (steel pop rivets) or screwed (10g self tapping) to the frame bracing straps.

Head Fixing (minimum):

  • Single door - none required
  • Paired door - double central fastener required

Stud size:

  • 65 x 34mm minimum of 0.55 SMG gauge

Wedging gap:

  • Not applicable

Insulation rating:

To obtain an insulation rating, the steel frame must be packed with either;

  • Plasterboard (30 minutes)
  • Ceramic fibre blanket (30 minutes)
  • Cornice plaster (30 minutes)
  • Grout (60 minutes)
  • Pyropanel M4 mortar (60 minutes)

No frame packing equals no insulation rating (i.e. -/xx/-)

F-D-VP30-120DA-S-S-1 image
WALL TYPE: Steel stud
FRAME TYPE: Steel, 1-part

Frame materials available:

  • EGZ - 1.6mm
  • Cold rolled galvanized - 1.6mm
  • Stainless Steel - 1.5mm (VP30 and 60DA ONLY)

Fasteners:

  • Frame screwed to boxed stud at 600mm centres nominal with self tapping screws.
  • Steel studs may be riveted (steel pop rivets) or screwed (10g self tapping) to the frame bracing straps at 600 centres nominal.

Head Fixing (minimum):

  • Single door - none required
  • Paired door - single central fastener required

Stud size:

  • 65 x 34mm minimum of 0.55 SMG gauge

Wedging gap:

  • Not applicable

Insulation rating:

To obtain an insulation rating, the steel frame must be packed with either;

  • Plasterboard (30 minutes)
  • Ceramic fibre blanket (30 minutes)
  • Cornice plaster (30 minutes)
  • Grout (60 minutes)
  • Pyropanel M4 mortar (60 minutes)

No frame packing equals no insulation rating (i.e. -/xx/-)

F-D-VP30-120DA-S-S-2 image
WALL TYPE: Steel stud
FRAME TYPE: Steel, 1-part

Frame materials available:

  • EGZ - 1.6mm
  • Cold rolled galvanized - 1.6mm
  • Stainless Steel - 1.5mm (VP30 and 60DA only)

Fasteners:

  • Frame screwed to boxed studs with packing steel shims at 600 centres nominal.
  • Steel studs may be riveted (steel pop rivets) or screwed (10g self tapping) to the frame bracing straps at 600 centres nominal.

Head Fixing (minimum):

  • Single door - none required
  • Paired door - double central fastener required

Stud size:

  • 65 x 34mm minimum of 0.55 SMG gauge

Wedging Gap:

  • 0-10mm

Insulation rating:

To obtain an insulation rating, the steel frame must be packed with either;

  • Plasterboard (30 minutes)
  • Ceramic fibre blanket (30 minutes)
  • Cornice plaster (30 minutes)
  • Grout (60 minutes)
  • Pyropanel M4 mortar (60 minutes)

No frame packing equals no insulation rating (i.e. -/xx/-)

F-D-VP30-120DA-S-S-3 image