Installation wall framing requirements
Pacific AFD300 Acoustic Door Set STC/Rw 40
Frame materials available:
- Hardwood timber - Min density 650kg/m3
- 42 mm or 30 mm timber jamb thickness
Fasteners:
- Frame - Either nailed (75 x3.2mm) or screwed (10g x 75mm) at 60mm centres nominal. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets type JFB100 at 500mm centres may be used.
Head Fixing
- Single door - none required.
- Paired door - double central fastener required.
Stud Size
- Stud to suit acoustic wall system of equal or greater rating required.
Wedging gap:
- 0-10mm
Frame materials available:
- Hardwood timber - Min density 650kg/m3
- 42 mm or 30 mm timber jamb thickness
Fasteners:
- Frame - Either nailed (75 x3.2mm) or screwed (10g x 75mm) at 60mm centres nominal. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets type JFB100 at 500mm centres may be used.
Head Fixing
- Single door - none required.
- Paired door - double central fastener required.
Stud Size
- Stud to suit acoustic wall system of equal or greater rating required.
Wedging gap:
- 0-10mm
Frame materials available:
- Hardwood timber - Min density 650kg/m3
- 42 mm or 30 mm timber jamb thickness
Fasteners:
- Frame - Either nailed (75 x3.2mm) or screwed (10g x 75mm) at 60mm centres nominal. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets type JFB100 at 500mm centres may be used.
Head Fixing
- Single door - none required.
- Paired door - double central fastener required.
Stud Size
- Stud to suit acoustic wall system of equal or greater rating required.
Wedging gap:
- 0-10mm
Frame materials available:
- Hardwood timber - Min density 650kg/m3
- 42 mm or 30 mm timber jamb thickness
Fasteners:
- Frame - M8 or M10 'Ramset' Dynabolts at 600mm centres nominal and near hinges. Fixings on or near centre of frame jamb.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing
- Single door - none required.
- Paired door - single central fastener required.
Wedging gap:
- 0-10mm
Fire Rated Interconnecting Doors
Frame materials available:
- Hardwood timber - Min. density 580kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres nominal. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JFB100 at 500mm centres may be used to fix profiles A & B to approved walls.
Stud size:
- Ex 100 x 50 minimum.
Wedging gap:
- 0-10mm
Frame materials available:
- Hardwood timber - Min. density 580kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres nominal. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JFB100 at 500mm centres may be used to fix to approved walls.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex100 x 50 minimum.
Wedging gap:
- 0-10mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frame to be screw fixed (10g self tapping) at 600mm centres nominal. Two fasteners per location where applicable.
Head Fixing (minimum)
- Single door - none required
- Paired door - single central fixing required
Stud Size:
- Ex 100 x50 minimum
Wedging gap:
- 0-10mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frame to be screw fixed (10g self tapping) at 600mm centres nominal. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 100x50 minimum.
Wedging gap:
- 0-10mm
Frame materials available:
- Hardwood timber - Min. density 580kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - M8 or M10 'Ramset' Dynabolts at 600mm centres nominal. Fixings on or near centre of frame jamb.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging gap:
- 0-15mm
Frame materials available:
- Hardwood timber - Min. density 580kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - M8 or M10 'Ramset' Dynabolts at 600mm centres nominal. Fixings on or near centre of frame jamb.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging gap:
- 0-15mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Jamb fixing at 600mm centres nominal
- Expansion anchors eg. M10 countersunk 'Ramset' Dynabolts
- M12 countersunk masonry screwbolts
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging gap:
- 0-10mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Jamb fixing at 600mm centres nominal
- Expansion anchors eg. M10 countersunk 'Ramset' Dynabolts
- M12 countersunk masonry screwbolts
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging Gap:
- 0-10mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frame screwed to boxed stud at 600mm centres nominal with self tapping screws.
- Steel studs may be riveted (steel pop rivets) or screwed (9g x 45mm self tapping) to the frame bracing straps.
Head Fixing (minimum):
- Single Door - none required
- Paired door - single central fastener required
Stud size:
92 x 34mm minimum of 0.55 SMG gauge
Wedging gap:
- 0-10mm
Pacific Smoke Control Door Set -/-/-sm
Frame materials available:
- Timber (any species), Pine clear standard
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JFB100 at 500mm centres may be used.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging gap:
- 0-10mm
Frame materials available:
- Timber (any species), Pine clear standard
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JFB100 at 500mm centres may be used.
Head Fixing (minimum):
- Single door - none required
- Paired door - Double central fastener required
Wedging gap:
- 0-10mm
Frame materials available:
- Timber (any species), Pine clear standard
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - Double central fastener required
Wedging gap:
- 0-15mm
Frame materials available:
- Timber (any species), Pine clear standard
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JFB100 at 500mm centres may be used.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging gap:
- 0-10mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Folded steel connection plates (as shown) to be supplied with frames.
- Hook onto frame bracing straps and nail or screw to timber studs. 2 per strap.
- Frame connection plates either clouts (30 x 2.5mm gib clouts) or screw fixed.
Head Fixing (minimum):
- Single door - none required
- Paired door - one central fixing required
Wedging Gap:
- N/A
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Framing stud No.1 screwed to jamb.
- Connection to stud No.2 via rebated nail on plates. One fastener per location except at bottom where two fasteners are required.
- Frame to be screw fixed (10g x 50mm self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging Gap:
- N/A
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Recommended Fasteners:
- Frame screwed to stud through packing.
- Frame to be screw fixed (10g x 50mm self tapping) at 600mm nominal centres. Two fasteners per location where applicable
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging gap:
- 0-10mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frames may be screwed directly to studs either through the stud and into the frame bracing straps or through the frame into the timber stud at 600mm nominal centres.
- Frame to be screw fixed (10g x 50mm self tapping) at 600mm min. centres. Two fasteners per location where applicable to each strap.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging Gap:
- 0-15mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frame to be screw fixed (8g x 50mm self tapping) through frame straps, timber packers and into timber stud. Standard is 4 No. per Jamb (Front section), 2 No. Per Jamb (Rear section)
Head Fixing (minimum):
- Single door - none required
- Paired door - 2 No. fastener required (Front section only)
Wedging Gap:
- 10mm
Frame materials available:
- Timber (any species), Pine clear standard
Fasteners:
- Frame - M8 or M10 'Ramset' Dynabolts at 600mm centres and near hinges. Fixings on or near centre of frame jamb.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400 centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging gap:
- 0-15mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Jamb fixing at 600mm nominal centres.
- Expansion anchors eg. M10 countersunk 'Ramset' Dynabolts
- M12 countersunk masonry screwbolts
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging Gap:
- 0-15mm
Frame materials available:
- Timber (any species), Pine clear standard
Fasteners:
- Frame - Screwed (10g x 50mm self tapping) at 600mm nominal centres. Minimum of one screw per location. Frames may also be installed by screw fixing the steel studs to the back of the timber frame during wall construction.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging gap:
- 0-10mm
Frame materials available:
- Timber (any species), Pine clear standard
Fasteners:
- Frame - Screwed (10g x 50mm self tapping) at 600mm nominal centres. Minimum of one screw per location. Frames may also be installed by screw fixing the steel studs to the back of the timber frame during wall construction.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging gap:
- 0-10mm
Frame materials available:
- Timber (any species), Pine clear standard
Fasteners:
- Frame - Screwed (10g x 50mm self tapping) at 600mm nominal centres. Minimum of one screw per location. Frame may also be installed by screw fixing the steel studs to the back of the timber frame during wall construction.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging gap:
- 0-10mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Boxed stud riveted with steel pop rivets or screwed with self tapping screws to frame bracing straps at 600mm nominal centres.
- Steel studs may be riveted (steel pop rivets) or screwed (9g x 45mm self tapping) to the frame bracing straps.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging Gap:
- N/A
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frame screwed to boxed stud at 600mm nominal centres with self tapping screws.
- Steel studs may be riveted (steel pop rivets) or screwed (9g x 45mm self tapping) to the frame bracing straps.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging Gap:
- N/A
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Jamb fixing at 600mm nominal centres Frame screwed to boxed studs through timber packing. Steel studs may be riveted (steel pop rivets) or screwed (9g x 45mm self tapping) to the frame bracing straps. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging Gap:
- 0-10mm
Pacific F15 Door Set -/15/15sm
Frame materials available:
- Radiata pine or denser (standard thickness is 30mm)
Fasteners:
- Frame - Screwed (10g x 50mm self tapping) at 600mm centres and near hinges. Two screws per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 75x50mm minimum
Wedging gap:
- 0-10mm
Frame materials available:
- Radiata pine or denser (standard thickness is 30mm)
Fasteners:
- Frame - Screwed (10g x 50mm self tapping) at 600mm centres and near hinges. Two screws per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 75x50mm minimum
Wedging gap:
- 0-10mm
Frame materials available:
- Radiata pine or denser (standard thickness is 30mm)
Fasteners:
- Frame - M8 or M10 'Ramset' Dynabolts at 600mm centres and near hinges. Fixings on or near centre of frame jamb.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave -nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging gap:
- 0-10mm
Frame materials available:
- Radiata pine or denser (standard thickness is 30mm)
Fasteners:
- Frame - Screwed (10g x 50mm self tapping) at 600mm centres and near hinges. Two screws per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Steel stud minimum 63mm, timber stud to match
Wedging gap:
- 0-10mm
Frame materials available:
- Radiata pine or denser (standard thickness is 30mm)
Fasteners:
- Frame - Screwed (10g x 50mm self tapping) at 600mm centres and near hinges. Two screws per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Steel stud minimum 63mm
Wedging gap:
- 0-10mm
Pacific VP30A Hinged Door Set -/30/30sm
Frame materials available:
- Hardwoods of minimum density 580 kg/m3 (minimum thickness is 30mm)
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres nominal. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JFB100 at 500mm centres may be used to fix profiles A & B to approved walls.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 75 x 50 minimum.
Wedging gap:
- 0-10mm
Frame materials available:
- Hardwood of minimum density 580 kg/m3 (minimum thickness is 30mm)
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres nominal. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JFB100 at 500mm centres may be used to fix profiles A & B to approved walls.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 75 x 50 minimum.
Wedging gap:
- 0-10mm
Frame materials available:
- Hardwood of minimum density 580 kg/m3 (minimum thickness is 30mm)
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 75 x 50 minimum.
Wedging gap:
- 0-15mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Folded steel connection plates (as shown) to be supplied with frames.
- Hook onto frame bracing straps and nail or screw to timber studs.
- Frame connection plates either clouts (30 x 2.5mm gib clouts) or screw fixed.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Framing stud No.1 screwed to jamb.
- Connection to stud No.2 via rebated nail on plates. One fastener per location except at bottom where two fasteners are required.
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 100x50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frame screwed to stud through Gib Fyreline packing between stud and shims.
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frames may be screwed directly to studs either through the stud and into the frame bracing straps or through the frame into the timber stud at 600mm centres nominal.
- Frame to be screw fixed (10g self tapping) at 600mm centres nominal. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
* EGZ - 1.6mm
* Cold rolled galvanized - 1.6mm
* Stainless Steel - 1.5mm
Fasteners:
- Frame to be screw fixed (10g self tapping through frame straps, timber packers and into timber stud. Standard is 4 No. per Jamb (Front section), 2 No. Per Jamb (Rear section)
Head Fixing (minimum):
- Single door - none required
- Paired door - 2 No. fasteners required (Front section only)
Stud size:
- Ex 100x50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres through frame straps and timber packers into timber stud.
- Standard is 4 no. per jamb (front section) and 2 no. per jamb (rear section)
Head Fixing (minimum):
- Single door - none required
- Paired door - 2 no. fasteners required (front section only)
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, all voids in the steel frame and wedging gaps must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket, 96 kg/m3 min. (30 minutes)
- Mineral wool blanket, 96 kg/m3 min. (30 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- Hardwood of minimum density 580 kg/m3 (minimum thickness is 30mm)
Fasteners:
- Frame - M8 or M10 'Ramset' Dynabolts at 600mm centres nominal. Fixings on or near centre of frame jamb.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave -nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging gap:
- 0-15mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (Must be fully grouted frame VP90-120)
Fasteners:
- Jamb fixing at 600mm centres minimum
- Expansion anchors eg. M10 countersunk 'Ramset' Dynabolts
- M12 countersunk masonry screwbolts
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging Gap:
- 0-15mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frame to be fixed with masonry anchors or screw bolts. Standard is 4 No. per Jamb. Rear insert fixed to frame with machine screws (drilled and tapped on site).
Head Fixing (minimum):
- Single door - none required
- Paired door - 2 No. fasteners required (Front section only)
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic wool, 96 kg/m3 (30 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- Hardwood of minimum density 580 kg/m3 (minimum thickness is 30mm)
Fasteners:
- Frame - Screwed (10g self tapping) at 600mm centres nominal. Minimum of one screw per location. Frames may also be installed by screw fixing the steel studs to the back of the timber frame during wall construction.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 MSG gauge.
Wedging gap:
- 0-10mm
Frame materials available:
- Hardwood of minimum density 580 kg/m3 (minimum thickness is 30mm)
Fasteners:
- Frame - Screwed (10g self tapping) at 600mm centres nominal. Minimum of one screw per location. Frames may also be installed by screw fixing the steel studs to the back of the timber frame during wall construction.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 MSG gauge.
Wedging gap:
- 0-10mm
Frame materials available:
- Hardwood timber of minimum density 580 kg/m3 (minimum thickness is 30mm)
Fasteners:
- Frame - Screwed (10g self tapping) at 600mm centres nominal. Minimum of one screw per location. Frames may also be installed by screw fixing the steel studs to the back of the timber frame during wall construction.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 MSG gauge.
Wedging gap:
- 0-10mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frame screwed to boxed stud at 600mm centres nominal with self tapping screws.
- Steel studs may be riveted (steel pop rivets) or screwed (10g self tapping) to the frame bracing straps at 600mm centres nominal.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frame screwed to boxed stud at 600mm centres nominal with self tapping screws.
- Steel studs may be riveted (steel pop rivets) or screwed (10g self tapping) to the frame bracing straps at 600mm centres nominal.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frame screwed to boxed studs with packing steel shims at 600mm centres nominal.
- Steel studs may be riveted (steel pop rivets) or screwed (10g self tapping) to the frame bracing straps at 600mm centres nominal.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- 92 x 34mm minimum of 0.55 SMG gauge
Wedging Gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres through frame straps and GiB Fyreline into timber stud.
- Standard is 4 no. per jamb (front section) and 2 no. per jamb (rear section)
Head Fixing (minimum):
- Single door - none required
- Paired door - 2 no. fasteners required (front section only)
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, all voids in the steel frame and wedging gaps must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket, 96 kg/m3 min. (30 minutes)
- Mineral wool blanket, 96 kg/m3 min. (30 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Pacific VP30 Hinged Door Set -/30/30sm
Frame materials available:
- Hardwood timber - Min density 580kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - Screwed (10g self tapping) at 600mm centres nominal. Two screws per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
Wall type:
- Korok panels with 13 mm FRR plasterboard on furring channels to one side. Trim opening to be framed with nom. 45 mm timber.
Wedging gap:
- 0-10mm
Frame materials available:
- Hardwood timber - Min density 580kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - Screwed (10g self tapping) at 600mm centres nominal. Two screws per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
Wall type:
- Korok panels with 13 mm FRR plasterboard on furring channels to one side. Trim opening to be framed with nom. 45 mm timber.
Wedging gap:
- 0-10mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing at 60mm centres minimum
- 10 Gauge self tapping screws
Head Fixing (minimum):
- Single door - 2 required
- Paired door - 4 required
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Please note that when using this installation method the frame has to be built into the wall. It can't be installed in a pre-formed opening.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10 x 75mm Gauge self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Note: This installation method is only applicable to 78 mm Korok walls
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10 x 75mm Gauge self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 78 mm wall: Max. FRR -/120/30
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- Hardwood of minimum density 580 kg/m3 (minimum thickness is 30mm)
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 75 x 50 minimum.
Wedging gap:
- 0-15mm
Frame materials available:
- Hardwood of minimum density 580 kg/m3 (minimum thickness is 42mm)
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres nominal. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JFB100 at 500mm centres may be used to fix profiles A & B to approved walls.
Stud size:
- Ex 75x50 minimum.
Wedging gap:
- 0-10mm
Frame materials available:
- Hardwood of minimum density 580 kg/m3 (minimum thickness is 30mm)
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 75 x 50 minimum.
Wedging gap:
- 0-15mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Folded steel connection plates (as shown) to be supplied with frames.
- Hook onto frame bracing straps and nail or screw to timber studs.
- Frame connection plates either clouts (30 x 2.5mm gib clouts) or screw fixed.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Framing stud No.1 screwed to jamb.
- Connection to stud No.2 via rebated nail on plates. One fastener per location except at bottom where two fasteners are required.
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 100x50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frame screwed to stud through Gib Fyreline packing between stud and shims.
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frames may be screwed directly to studs either through the stud and into the frame bracing straps or through the frame into the timber stud at 600mm centres nominal.
- Frame to be screw fixed (10g self tapping) at 600mm centres nominal. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- Cold rolled galvanized - 1.6mm packed with pla board
Fasteners:
- Frame to be screw fixed with 10-14 x 75mm gauge counter sunk screws at 600mm centres nominal.
Head Fixing (minimum):
- Single door - non required
- Paired door - double central fastener required
Stud Size
- Ex 100 x 50 minimum
Wedging gap:
- 0 - 10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- Cold rolled galvanized - 1.6mm packed with pla board
Fasteners:
- Frame to be screw fixed with 10 x 75mm gauge screws at 600mm centres nominal.
Head Fixing (minimum):
- Single door - non required
- Paired door - double central fastener required
Stud Size
- Ex 100 x 50 minimum
Wedging gap:
0 - 10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Gib Universal wall systems - One way FRR only
Please refer to Gib Fire Rated Systems manual for thickness and number of lining boards.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Framing stud No.1 screwed to jamb.
- Connection to stud No.2 via rebated nail on plates. One fastener per location except at bottom where two fasteners are required.
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Pair door - single central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Gib Universal wall systems - One way FRR only
Please refer to Gib Fire Rated Systems manual for thickness and number of lining boards.
Frame materials available:
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to stud
- Frame to be screw fixed (10g self tapping) at 600 mm nominal centres. Two fasteners per location where applicable
Head Fixing (minimum):
- Single door - none required
- Pair door - double central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- 0-10 mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to stud through Gib Fyreline packing between stud and shims.
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to stud through frame wings
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex. 100x50 mm minimum
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Gib GWTLE30 wall specification
Frame materials available:
- Cold rolled galvanized - 1.6mm packed with plaster board
Fasteners:
- Frame to be screw fixed with 10-14 x 75mm gauge counter sunk screws at 600mm centres nominal.
Head Fixing (minimum):
- Single door - non required
- Paired door - double central fastener required
Stud Size
- Ex 100 x 50 minimum
Wedging gap:
- 0 - 10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (30 minutes)
- Pyropanel M4 mortar (30 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres through frame straps and timber packers into timber stud.
- Standard is 4 no. per jamb (front section) and 2 no. per jamb (rear section)
Head Fixing (minimum):
- Single door - none required
- Paired door - 2 no. fasteners required (front section only)
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, all voids in the steel frame and wedging gaps must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket, 96 kg/m3 min. (30 minutes)
- Mineral wool blanket, 96 kg/m3 min. (30 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- Hardwood of minimum density 580 kg/m3 (minimum thickness is 30mm)
Fasteners:
- Frame - M8 or M10 'Ramset' Dynabolts at 600mm centres nominal. Fixings on or near centre of frame jamb.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave -nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging gap:
- 0-15mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (Must be fully grouted frame VP90-120)
Fasteners:
- Jamb fixing at 600mm centres minimum
- Expansion anchors eg. M10 countersunk 'Ramset' Dynabolts
- M12 countersunk masonry screwbolts
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging Gap:
- 0-15mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frame to be fixed with masonry anchors or screw bolts. Standard is 4 No. per Jamb. Rear insert fixed to frame with machine screws (drilled and tapped on site).
Head Fixing (minimum):
- Single door - none required
- Paired door - 2 No. fasteners required (Front section only)
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic wool, 96 kg/m3 (30 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- Hardwood of minimum density 580 kg/m3 (minimum thickness is 30mm)
Fasteners:
- Frame - Screwed (10g self tapping) at 600mm centres nominal. Minimum of one screw per location. Frames may also be installed by screw fixing the steel studs to the back of the timber frame during wall construction.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 MSG gauge.
Wedging gap:
- 0-10mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frame screwed to boxed stud at 600mm centres nominal with self tapping screws.
- Steel studs may be riveted (steel pop rivets) or screwed (10g self tapping) to the frame bracing straps at 600mm centres nominal.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frame screwed to boxed studs with packing steel shims at 600mm centres nominal.
- Steel studs may be riveted (steel pop rivets) or screwed (10g self tapping) to the frame bracing straps at 600mm centres nominal.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- 92 x 34mm minimum of 0.55 SMG gauge
Wedging Gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to stud through Gib Fyreline packing between stud and shims.
- Frame to be screw fixed (10g x 50mm self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- 92 x 34mm minimum of 0.55 SMG gauge
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to stud through frame wings
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 MSG gauge.
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres through frame straps and GiB Fyreline into timber stud.
- Standard is 4 no. per jamb (front section) and 2 no. per jamb (rear section)
Head Fixing (minimum):
- Single door - none required
- Paired door - 2 no. fasteners required (front section only)
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, all voids in the steel frame and wedging gaps must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket, 96 kg/m3 min. (30 minutes)
- Mineral wool blanket, 96 kg/m3 min. (30 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Pacific VP30HR Hinged Door Set -/30/30sm
Frame materials available:
- Hardwood of minimum density 580 kg/m3 (minimum thickness is 30mm)
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 75 x 50 minimum.
Wedging gap:
- 0-15mm
Frame materials available:
- Hardwood of minimum density 580 kg/m3 (minimum thickness is 42mm)
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres nominal. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JFB100 at 500mm centres may be used to fix profiles A & B to approved walls.
Stud size:
- Ex 75x50 minimum.
Wedging gap:
- 0-10mm
Frame materials available:
- Hardwood of minimum density 580 kg/m3 (minimum thickness is 30mm)
Fasteners:
- Frame - M8 or M10 'Ramset' Dynabolts at 600mm centres nominal. Fixings on or near centre of frame jamb.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave -nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging gap:
- 0-15mm
Frame materials available:
- Hardwood of minimum density 580 kg/m3 (minimum thickness is 30mm)
Fasteners:
- Frame - Screwed (10g self tapping) at 600mm centres nominal. Minimum of one screw per location. Frames may also be installed by screw fixing the steel studs to the back of the timber frame during wall construction.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 MSG gauge.
Wedging gap:
- 0-10mm
Pacific VP30HR Double Action Timber Framed Door Set -/30/30
Frame materials available:
- Radiata pine or denser (standard thickness is 30mm)
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JFB100 at 500mm centres may be used to fix profiles A & B to approved walls.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- ex75 x 50mm minimum.
Wedging gap:
- 0-10mm
Frame materials available:
- Radiata pine or denser (standard thickness is 30mm)
Fasteners:
- Frame - M8 or M10 'Ramset' Dynabolts at 600mm centres and near hinges. Fixings on or near centre of frame jamb.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging gap:
- 0-15mm
Frame materials available:
- Radiata pine or denser (standard thickness is 30mm)
Fasteners:
- Frame - Screwed (10g self tapping) at 600mm min. centres. Minimum of one screw per location. Frames may also be installed by screw fixing the steel studs to the back of the timber frame during wall construction.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 MSG gauge.
Wedging gap:
- 0-10mm
Pacific VP30 Double Action Door Set -/30/30 SM
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP30-60DA only)
Fasteners:
- Folded steel connection plates (as shown) to be supplied with frames.
- Hook onto frame bracing straps and nail or screw to timber studs.
- Frame connection plates either clouts (30 x 2.5mm gib clouts) or screw fixed.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fixing required
Stud size:
- Ex 100x50mm minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP30-60DA only)
Fasteners:
- Framing stud No.1 screwed to jamb.
- Connection to stud No.2 via rebated nail on plates. One fastener per location except at bottom where two fasteners are required.
- Frame to be screw fixed (10g self tapping) at 600mm centres nominal. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 100x50mm minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP30-60DA ONLY)
Fasteners:
- Frame screwed to stud through Gib Fyreline packing between stud and shims.
- Frame to be screw fixed (10g self tapping) at 600mm centres nominal. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 100x50mm minimum
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP30-60 ONLY)
Fasteners:
- Frames may be screwed directly to studs either through the stud and into the frame bracing straps or through the frame into the timber stud at 600mm centres nominal.
- Frame to be screw fixed (10g self tapping) at 600mm centres nominal. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 100x50mm minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP30-60DA ONLY)
Fasteners:
- Frame screwed to stud through Gib Fyreline packing between stud and shims.
- Frame to be screw fixed (10g self tapping) at 600mm centres nominal.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- 90x45mm minimum
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP120DA Must be fully grouted frame)
Fasteners:
- Jamb fixing at 600mm centres nominal
- Expansion anchors eg. M10 countersunk 'Ramset' Dynabolts
- M12 countersunk masonry screwbolts
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging Gap:
- 0-15mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP30 & 60 ONLY)
Fasteners:
- Boxed stud riveted with steel pop rivets or screwed with self tapping screws to frame bracing straps at 600mm centres minimum.
- Steel studs may be riveted (steel pop rivets) or screwed (10g self tapping) to the frame bracing straps.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP30 and 60DA ONLY)
Fasteners:
- Frame screwed to boxed stud at 600mm centres nominal with self tapping screws.
- Steel studs may be riveted (steel pop rivets) or screwed (10g self tapping) to the frame bracing straps at 600 centres nominal.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP30 and 60DA only)
Fasteners:
- Frame screwed to boxed studs with packing steel shims at 600 centres nominal.
- Steel studs may be riveted (steel pop rivets) or screwed (10g self tapping) to the frame bracing straps at 600 centres nominal.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging Gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Pacific VP30-S Sliding Fire Door Set -/30/30
Pacific F0.5 Door Set -/30/30sm
Frame materials available:
- Radiata pine or denser, minimum 30mm thick (standard
Fasteners:
- Frame - either nailed (75x3.2mm) or screwed (10gx75mm) at 600mm centres. Two nails or screws per location.
- Stops - nailed (50x3.2mm) at 200mm centres.
- Architrave - nailed (50x3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JBF100 at 500mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 75x50mm minimum
Wedging gap:
- 0-6mm
Frame materials available:
- Radiata pine or denser, minimum 30mm thick (standard thicknesses are 30mm or 42mm)
Fasteners:
- Frame - either nailed (75x3.2mm) or screwed (10gx75mm) at 600mm centres. Two nails or screws per location.
- Stops - nailed (50x3.2mm) at 200mm centres.
- Architrave - nailed (50x3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JBF100 at 500mm centres.
Stud size:
- ex 75x50mm minimum
Wedging gap:
- 0-6mm
Frame materials available:
- Radiata pine or denser, minimum 30mm thick (standard thicknesses are 30mm or 42mm)
Fasteners:
- Frame - either nailed (75x3.2mm) or screwed (10gx75mm) at 600mm centres. Two nails or screws per location.
- Stops - nailed (50x3.2mm) at 200mm centres.
- Architrave - nailed (50x3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 75x50mm minimum
Wedging gap:
- 0-6mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanised - 1.6mm
Fasteners:
- Folded steel connection plates (as shown) to be supplied with frames.
- Hook onto frame bracing straps and nail or screw to timber studs.
- Frame connection plates either clouts (30 x 2.5mm gib clouts) or screw fixed.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 75x50 minimum
Wedging Gap:
- Not applicable
Frame materials available:
- Radiata pine or denser, minimum 30mm thick (standard thicknesses are 30mm or 42mm)
Fasteners:
- Frame - M8 'Ramset' Dynabolts at 600mm centres nominal.
- Stops - nailed (50x3.2mm) at 200mm centres.
- Architrave - nailed (50x3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required.
- Paired door - single central fastener required.
Wedging gap:
- 0-6mm.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Countersunk anchor method - Jamb fixings at 600mm centres nominal: M10 expansion anchors eg Dynabolt D10102F (as shown) or M12 masonry screwbolts. The length of bolts MUST be confirmed on site to suit the frame openings formed.
Head Fixing (minimum):
- Single door - none required.
- Paired door - single central fastener required.
Wedging Gap:
- 0-15mm
Frame materials available:
- Radiata pine or denser, minimum 30mm thick (standard thicknesses are 30mm or 42mm)
Fasteners:
- Frame - either nailed (75x3.2mm) or screwed (10gx75mm) at 600mm centres. Two nails or screws per location.
- Stops - nailed (50x3.2mm) at 200mm centres.
- Architrave - nailed 50x3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JBF100 at 500mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Steel stud minimum 63mm, timber stud to match
Wedging gap:
- 0-6mm
Frame materials available:
- Radiata pine or denser, minimum 30mm thick (standard thicknesses are 30mm or 42mm)
Fasteners:
- Frame - either nailed (75x3.2mm) or screwed (10gx75mm) at 600mm centres. Two nails or screws per location.
- Stops - nailed (50x3.2mm) at 200mm centres.
- Architrave - nailed (50x3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JBF100 at 500mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Steel stud minimum 63mm, timber stud to match
Wedging gap:
- 0-6mm
Frame materials available:
- Radiata pine or denser, minimum 30mm thick (standard thicknesses are 30mm or 42mm)
Fasteners:
- Frame - either nailed (75x3.2mm) or screwed (10gx75mm) at 600mm centres. Two nails or screws per location.
- Stops - nailed (50x3.2mm) at 200mm centres. Architrave - nailed 50x3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JBF100 at 500mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Steel stud minimum 63mm, timber stud to match
Wedging gap:
- 0-6mm
Pacific VP60A Door Set -/60/60sm
Frame materials available:
- Hardwood timber - Min. density 580 kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres nominal. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JFB100 at 500mm centres may be used to fix profiles A & B to approved walls.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 100 x 50 minimum.
Wedging gap:
- 0-10mm
Frame materials available:
- Hardwood timber - Min. density 580kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres nominal. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JFB100 at 500mm centres may be used to fix profiles A & B to approved walls.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 100 x 50 minimum.
Wedging gap:
- 0-10mm
Frame materials available:
- Hardwood Timber - Min. density 580kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres nominal. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex100x50 minimum.
Wedging gap:
- 0-15mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Folded steel connection plates (as shown) to be supplied with frames.
- Hook onto frame bracing straps and nail or screw to timber studs.
- Frame connection plates either clouts (30 x 2.5mm gib clouts) or screw fixed.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Framing stud No.1 screwed to jamb.
- Connection to stud No.2 via rebated nail on plates. One fastener per location except at bottom where two fasteners are required.
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 100x50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frame screwed to stud through Gib Fyreline packing between stud and shims.
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frames may be screwed directly to studs either through the stud and into the frame bracing straps or through the frame into the timber stud at 600mm centres nominal.
- Frame to be screw fixed (10g self tapping) at 600mm centres nominal. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
* EGZ - 1.6mm
* Cold rolled galvanized - 1.6mm
* Stainless Steel - 1.5mm
Fasteners:
- Frame to be screw fixed (10g self tapping through frame straps, timber packers and into timber stud. Standard is 4 No. per Jamb (Front section), 2 No. Per Jamb (Rear section)
Head Fixing (minimum):
- Single door - none required
- Paired door - 2 No. fasteners required (Front section only)
Stud size:
- Ex 100x50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres through frame straps and timber packers into timber stud.
- Standard is 4 no. per jamb (front section) and 2 no. per jamb (rear section)
Head Fixing (minimum):
- Single door - none required
- Paired door - 2 no. fasteners required (front section only)
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, all voids in the steel frame and wedging gaps must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket, 96 kg/m3 min. (30 minutes)
- Mineral wool blanket, 96 kg/m3 min. (30 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- Hardwood timber - Min density 580kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - M8 or M10 'Ramset' Dynabolts at 600mm centres nominal. Fixings on or near centre of frame jamb.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging gap:
- 0-15mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (Must be fully grouted frame VP90-120)
Fasteners:
- Jamb fixing at 600mm centres minimum
- Expansion anchors eg. M10 countersunk 'Ramset' Dynabolts
- M12 countersunk masonry screwbolts
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging Gap:
- 0-15mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frame to be fixed with masonry anchors or screw bolts. Standard is 4 No. per Jamb. Rear insert fixed to frame with machine screws (drilled and tapped on site).
Head Fixing (minimum):
- Single door - none required
- Paired door - 2 No. fasteners required (Front section only)
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic wool, 96 kg/m3 (30 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Pacific VP60 Door Set -/60/60sm
Frame materials available:
- Hardwood timber - Min density 580kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - Screwed (10g self tapping) at 600mm centres nominal. Two screws per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
Wall type:
- Korok panels with 13 mm FRR plasterboard on furring channels to one side. Trim opening to be framed with nom. 45 mm timber.
Wedging gap:
- 0-10mm
Frame materials available:
- Hardwood timber - Min density 580kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - Screwed (10g self tapping) at 600mm centres nominal. Two screws per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
Wall type:
- Korok panels with 13 mm FRR plasterboard on furring channels to one side. Trim opening to be framed with nom. 45 mm timber.
Wedging gap:
- 0-10mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10 x 75mm Gauge self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Note: This installation method is only applicable to 78 mm Korok walls
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10 x 75mm Gauge self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 78 mm wall: Max. FRR -/120/30
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- Hardwood timber - Min. density 580 kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres nominal. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JFB100 at 500mm centres may be used to fix profiles A & B to approved walls.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 100 x 50 minimum.
Wedging gap:
- 0-10mm
Frame materials available:
- Hardwood timber - Min. density 580kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres nominal. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JFB100 at 500mm centres may be used to fix profiles A & B to approved walls.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 100 x 50 minimum.
Wedging gap:
- 0-10mm
Frame materials available:
- Hardwood Timber - Min. density 580kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres nominal. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex100x50 minimum.
Wedging gap:
- 0-15mm
Frame materials available:
- Hardwood timber - Min. density 580 kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres nominal. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JFB100 at 500mm centres may be used to fix profiles A & B to approved walls.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 100 x 50 minimum.
Wedging gap:
- 0-10mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Folded steel connection plates (as shown) to be supplied with frames.
- Hook onto frame bracing straps and nail or screw to timber studs.
- Frame connection plates either clouts (30 x 2.5mm gib clouts) or screw fixed.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Framing stud No.1 screwed to jamb.
- Connection to stud No.2 via rebated nail on plates. One fastener per location except at bottom where two fasteners are required.
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 100x50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frame screwed to stud through Gib Fyreline packing between stud and shims.
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frames may be screwed directly to studs either through the stud and into the frame bracing straps or through the frame into the timber stud at 600mm centres nominal.
- Frame to be screw fixed (10g self tapping) at 600mm centres nominal. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- Cold rolled galvanized - 1.6mm packed with pla board
Fasteners:
- Frame to be screw fixed with 10-14 x 75mm gauge counter sunk screws at 600mm centres nominal.
Head Fixing (minimum):
- Single door - non required
- Paired door - double central fastener required
Stud Size
- Ex 100 x 50 minimum
Wedging gap:
- 0 - 10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- Cold rolled galvanized - 1.6mm packed with pla board
Fasteners:
- Frame to be screw fixed with 10 x 75mm gauge screws at 600mm centres nominal.
Head Fixing (minimum):
- Single door - non required
- Paired door - double central fastener required
Stud Size
- Ex 100 x 50 minimum
Wedging gap:
0 - 10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Gib Universal wall systems - One way FRR only
Please refer to Gib Fire Rated Systems manual for thickness and number of lining boards.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Framing stud No.1 screwed to jamb.
- Connection to stud No.2 via rebated nail on plates. One fastener per location except at bottom where two fasteners are required.
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Pair door - single central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Gib Universal wall systems - One way FRR only
Please refer to Gib Fire Rated Systems manual for thickness and number of lining boards.
Frame materials available:
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to stud
- Frame to be screw fixed (10g self tapping) at 600 mm nominal centres. Two fasteners per location where applicable
Head Fixing (minimum):
- Single door - none required
- Pair door - double central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- 0-10 mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to stud through Gib Fyreline packing between stud and shims.
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to stud through frame wings
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex. 100x50 mm minimum
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Gib GWTLE60a wall specification
Frame materials available:
- Cold rolled galvanized - 1.6mm packed with plaster board
Fasteners:
- Frame to be screw fixed with 10-14 x 75mm gauge counter sunk screws at 600mm centres nominal.
Head Fixing (minimum):
- Single door - non required
- Paired door - double central fastener required
Stud Size
- Ex 100 x 50 minimum
Wedging gap:
- 0 - 10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres through frame straps and timber packers into timber stud.
- Standard is 4 no. per jamb (front section) and 2 no. per jamb (rear section)
Head Fixing (minimum):
- Single door - none required
- Paired door - 2 no. fasteners required (front section only)
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, all voids in the steel frame and wedging gaps must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket, 96 kg/m3 min. (30 minutes)
- Mineral wool blanket, 96 kg/m3 min. (30 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- Hardwood timber - Min density 580kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - M8 or M10 'Ramset' Dynabolts at 600mm centres nominal. Fixings on or near centre of frame jamb.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging gap:
- 0-15mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (Must be fully grouted frame VP90-120)
Fasteners:
- Jamb fixing at 600mm centres minimum
- Expansion anchors eg. M10 countersunk 'Ramset' Dynabolts
- M12 countersunk masonry screwbolts
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging Gap:
- 0-15mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frame to be fixed with masonry anchors or screw bolts. Standard is 4 No. per Jamb. Rear insert fixed to frame with machine screws (drilled and tapped on site).
Head Fixing (minimum):
- Single door - none required
- Paired door - 2 No. fasteners required (Front section only)
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic wool, 96 kg/m3 (30 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- Hardwood timber - Min density 580kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - Screwed (10g x 50mm self tapping) at 600mm centres nominal. Minimum of one screw per location. Frames may also be installed by screw fixing the steel studs to the back of the timber frame during wall construction.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fixing required
Stud size:
- 65 x 34mm minimum of 0.55 MSG gauge.
Wedging gap:
- 0-10mm
Frame materials available:
- Hardwood timber - Min. density580kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - Screwed (10g x 50mm self tapping) at 600mm centres nominal. Minimum of one screw per location. Frames may also be installed by screw fixing the steel studs to the back of the timber frame during wall construction.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fixing required
Stud size:
- 65 x 34mm minimum of 0.55 MSG gauge.
Wedging gap:
- 0-10mm
Frame materials available:
- Hardwood timber - Min. density 580kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - Screwed (10g x 50mm self tapping) at 600mm centres nominal. Minimum of one screw per location. Frames may also be installed by screw fixing the steel studs to the back of the timber frame during wall construction.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 MSG gauge.
Wedging gap:
- 0-10mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frame screwed to boxed stud at 600mm centres nominal with self tapping screws.
- Steel studs may be riveted (steel pop rivets) or screwed (10g self tapping) to the frame bracing straps at 600mm centres nominal.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frame screwed to boxed studs with packing steel shims at 600mm centres nominal.
- Steel studs may be riveted (steel pop rivets) or screwed (10g self tapping) to the frame bracing straps at 600mm centres nominal.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- 92 x 34mm minimum of 0.55 SMG gauge
Wedging Gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to stud through Gib Fyreline packing between stud and shims.
- Frame to be screw fixed (10g x 50mm self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- 92 x 34mm minimum of 0.55 SMG gauge
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to stud through frame wings
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 MSG gauge.
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Gib GWSE60 wall specification
Frame materials available:
- Cold rolled galvanized - 1.6mm packed with plaster board
Fasteners:
- Frame to be screw fixed with 10-14 x 75mm gauge counter sunk screws at 600mm centres nominal.
Head Fixing (minimum):
- Single door - non required
- Paired door - double central fastener required
Stud Size
- Minimum steel stud dimensions to be 92 x 34 x 0.50mm nominal
with a 6mm return
Wedging gap:
- 0 - 10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres through frame straps and GiB Fyreline into timber stud.
- Standard is 4 no. per jamb (front section) and 2 no. per jamb (rear section)
Head Fixing (minimum):
- Single door - none required
- Paired door - 2 no. fasteners required (front section only)
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, all voids in the steel frame and wedging gaps must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket, 96 kg/m3 min. (30 minutes)
- Mineral wool blanket, 96 kg/m3 min. (30 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
PACIFIC FS60 Cavity Sliding Door Set -/60/30
Frame materials available:
- EGZ - 2.0mm
- Cold rolled galvanized - 2.0mm
Fasteners:
- Nominal 400mm centres
- 10g x 50mm screw fixing
Head Fixing (minimum):
- Through pre-drilled holes provided
Wedging Gap:
- 5-10mm
Frame materials available:
- EGZ - 2.0mm
- Cold rolled galvanized - 2.0mm
Fasteners:
- Nominal 400mm centres
- 10g x 50mm screw fixing
Head Fixing (minimum):
- Through pre-drilled holes provided
Wedging Gap:
- 5-10mm
Frame materials available:
- EGZ - 2.0mm
- Cold rolled galvanized - 2.0mm
Fasteners:
- Nominal 400mm centres
- 10g x 50mm screw fixing
Head Fixing (minimum):
- Through pre-drilled holes provided
Wedging Gap:
- 5-10mm
Frame materials available:
- EGZ - 2.0mm
- Cold rolled galvanized - 2.0mm
Fasteners:
- Nominal 400mm centres
- 10g x 50mm screw fixing
Head Fixing (minimum):
- Through pre-drilled holes provided
Wedging Gap:
- 5-10mm
Pacific VP60HR Door Set -/60/60sm
Frame materials available:
- Hardwood timber - Min. density 580 kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres nominal. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JFB100 at 500mm centres may be used to fix profiles A & B to approved walls.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 100 x 50 minimum.
Wedging gap:
- 0-10mm
Frame materials available:
- Hardwood timber - Min. density 580kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres nominal. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JFB100 at 500mm centres may be used to fix profiles A & B to approved walls.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 100 x 50 minimum.
Wedging gap:
- 0-10mm
Frame materials available:
- Hardwood Timber - Min. density 580kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres nominal. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex100x50 minimum.
Wedging gap:
- 0-15mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Folded steel connection plates (as shown) to be supplied with frames.
- Hook onto frame bracing straps and nail or screw to timber studs.
- Frame connection plates either clouts (30 x 2.5mm gib clouts) or screw fixed.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Framing stud No.1 screwed to jamb.
- Connection to stud No.2 via rebated nail on plates. One fastener per location except at bottom where two fasteners are required.
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 100x50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frame screwed to stud through Gib Fyreline packing between stud and shims.
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frames may be screwed directly to studs either through the stud and into the frame bracing straps or through the frame into the timber stud at 600mm centres nominal.
- Frame to be screw fixed (10g self tapping) at 600mm centres nominal. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- Hardwood timber - Min density 580kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - M8 or M10 'Ramset' Dynabolts at 600mm centres nominal. Fixings on or near centre of frame jamb.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging gap:
- 0-15mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (Must be fully grouted frame VP90-120)
Fasteners:
- Jamb fixing at 600mm centres minimum
- Expansion anchors eg. M10 countersunk 'Ramset' Dynabolts
- M12 countersunk masonry screwbolts
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging Gap:
- 0-15mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- Hardwood timber - Min density 580kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - Screwed (10g x 50mm self tapping) at 600mm centres nominal. Minimum of one screw per location. Frames may also be installed by screw fixing the steel studs to the back of the timber frame during wall construction.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fixing required
Stud size:
- 65 x 34mm minimum of 0.55 MSG gauge.
Wedging gap:
- 0-10mm
Frame materials available:
- Hardwood timber - Min. density580kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - Screwed (10g x 50mm self tapping) at 600mm centres nominal. Minimum of one screw per location. Frames may also be installed by screw fixing the steel studs to the back of the timber frame during wall construction.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fixing required
Stud size:
- 65 x 34mm minimum of 0.55 MSG gauge.
Wedging gap:
- 0-10mm
Frame materials available:
- Hardwood timber - Min. density 580kg/m≥ (minimum thickness is 30mm)
Fasteners:
- Frame - Screwed (10g x 50mm self tapping) at 600mm centres nominal. Minimum of one screw per location. Frames may also be installed by screw fixing the steel studs to the back of the timber frame during wall construction.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 MSG gauge.
Wedging gap:
- 0-10mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frame screwed to boxed stud at 600mm centres nominal with self tapping screws.
- Steel studs may be riveted (steel pop rivets) or screwed (10g self tapping) to the frame bracing straps at 600mm centres nominal.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Frame screwed to boxed studs with packing steel shims at 600mm centres nominal.
- Steel studs may be riveted (steel pop rivets) or screwed (10g self tapping) to the frame bracing straps at 600mm centres nominal.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- 92 x 34mm minimum of 0.55 SMG gauge
Wedging Gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Pacific VP60DA Double Action Door Set -/60/60 SM
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP30-60DA only)
Fasteners:
- Folded steel connection plates (as shown) to be supplied with frames.
- Hook onto frame bracing straps and nail or screw to timber studs.
- Frame connection plates either clouts (30 x 2.5mm gib clouts) or screw fixed.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fixing required
Stud size:
- Ex 100x50mm minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP30-60DA only)
Fasteners:
- Framing stud No.1 screwed to jamb.
- Connection to stud No.2 via rebated nail on plates. One fastener per location except at bottom where two fasteners are required.
- Frame to be screw fixed (10g self tapping) at 600mm centres nominal. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 100x50mm minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP30-60DA ONLY)
Fasteners:
- Frame screwed to stud through Gib Fyreline packing between stud and shims.
- Frame to be screw fixed (10g self tapping) at 600mm centres nominal. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 100x50mm minimum
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP30-60 ONLY)
Fasteners:
- Frames may be screwed directly to studs either through the stud and into the frame bracing straps or through the frame into the timber stud at 600mm centres nominal.
- Frame to be screw fixed (10g self tapping) at 600mm centres nominal. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 100x50mm minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP30-60DA ONLY)
Fasteners:
- Frame screwed to stud through Gib Fyreline packing between stud and shims.
- Frame to be screw fixed (10g self tapping) at 600mm centres nominal.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- 90x45mm minimum
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP120DA Must be fully grouted frame)
Fasteners:
- Jamb fixing at 600mm centres nominal
- Expansion anchors eg. M10 countersunk 'Ramset' Dynabolts
- M12 countersunk masonry screwbolts
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging Gap:
- 0-15mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP30 & 60 ONLY)
Fasteners:
- Boxed stud riveted with steel pop rivets or screwed with self tapping screws to frame bracing straps at 600mm centres minimum.
- Steel studs may be riveted (steel pop rivets) or screwed (10g self tapping) to the frame bracing straps.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP30 and 60DA ONLY)
Fasteners:
- Frame screwed to boxed stud at 600mm centres nominal with self tapping screws.
- Steel studs may be riveted (steel pop rivets) or screwed (10g self tapping) to the frame bracing straps at 600 centres nominal.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP30 and 60DA only)
Fasteners:
- Frame screwed to boxed studs with packing steel shims at 600 centres nominal.
- Steel studs may be riveted (steel pop rivets) or screwed (10g self tapping) to the frame bracing straps at 600 centres nominal.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging Gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Pacific VP60-S Sliding Fire Door Set-/60/30
Pacific SPS1-FR Hinged Door Set -/60/60
Frame materials available:
- EGZ - 2.0mm
- Cold rolled galvanized - 2.0mm
Fasteners:
- Jamb fixings at 600mm centres nominal
- M12 countersunk masonry screwbolts (through adjustable spacer fixing bracket)
Head Fixing (minimum):
- Single door - none required.
- Paired door - single central fastener required.
Wedging Gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Grout (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 2.0mm
- Cold rolled galvanized - 2.0mm
Fasteners:
- Jamb fixings at 600mm centres nominal
- Expansion anchors eg. M10 countersunk 'Ramset' Dynabolts
- M12 countersunk masonry screwbolts (through adjustable spacer fixing bracket)
Head Fixing (minimum):
- Single door - none required.
- Paired door - single central fastener required.
Wedging Gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Grout (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Pacific VP90 Door Set -/90/60sm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10 x 75mm Gauge self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Note: This installation method is only applicable to 78 mm Korok walls
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10 x 75mm Gauge self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 78 mm wall: Max. FRR -/120/30
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Folded steel connection plates (as shown) to be supplied with frames.
- Hook onto frame bracing straps and nail or screw to timber studs.
- Frame connection plates either clouts (30 x 2.5mm gib clouts) or screw fixed.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Framing stud No.1 screwed to jamb.
- Connection to stud No.2 via rebated nail on plates. One fastener per location except at bottom where two fasteners are required.
- Frame to be screw fixed (10g x 50mm self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to stud through Gib Fyreline packing between stud and shims.
- Frame to be screw fixed (10g x 50mm self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frames may be screwed directly to studs either through the stud and into the frame bracing straps or through the frame into the timber stud at 600mm centres minimum.
- Frame to be screw fixed (10g x 50mm self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Gib Universal wall systems - One way FRR only
Please refer to Gib Fire Rated Systems manual for thickness and number of lining boards.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Framing stud No.1 screwed to jamb.
- Connection to stud No.2 via rebated nail on plates. One fastener per location except at bottom where two fasteners are required.
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Pair door - single central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Gib Universal wall systems - One way FRR only
Please refer to Gib Fire Rated Systems manual for thickness and number of lining boards.
Frame materials available:
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to stud
- Frame to be screw fixed (10g self tapping) at 600 mm nominal centres. Two fasteners per location where applicable
Head Fixing (minimum):
- Single door - none required
- Pair door - double central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- 0-10 mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to stud through Gib Fyreline packing between stud and shims.
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to stud through frame wings
- Frame to be screw fixed (10g x 50mm self tapping) at 600mm nominal centres
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex. 100x50 mm minimum
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (Must be fully grouted frame VP90-120)
Fasteners:
- Jamb fixing at 600mm centres minimum
- Expansion anchors eg. M10 countersunk 'Ramset' Dynabolts
- M12 countersunk masonry screwbolts
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging Gap:
- 0-15mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Boxed stud riveted with steel pop rivets or screwed with self tapping screws to frame bracing straps at 600mm centres minimum.
- Steel studs may be riveted (steel pop rivets) or screwed (9g x 45mm self tapping) to the frame bracing straps.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to boxed stud at 600mm centres minimum with self tapping screws.
- Steel studs may be riveted (steel pop rivets) or screwed (9g x 45mm self tapping) to the frame bracing straps.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to boxed studs with packing steel shims.
- Steel studs may be riveted (steel pop rivets) or screwed (9g x 45mm self tapping) to the frame bracing straps.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging Gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to stud through Gib Fyreline packing between stud and shims.
- Frame to be screw fixed (10g x 50mm self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- 92 x 34mm minimum of 0.55 SMG gauge
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to stud through frame wings
- Frame to be screw fixed (10g x 50mm self tapping) at 600mm nominal centres
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 MSG gauge.
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Pacific VP90-S Sliding Fire Door Set -/90/30
Pacific SPS1-E Hinged Door Set -/90/60
Frame materials available:
- EGZ - 2.0mm
- Cold rolled galvanized - 2.0mm
Fasteners:
- Jamb fixings at 600mm centres nominal
- Expansion anchors eg. M10 countersunk 'Ramset' Dynabolts
- M12 countersunk masonry screwbolts (through adjustable spacer fixing bracket)
Head Fixing (minimum):
- Single door - none required.
- Paired door - single central fastener required.
Wedging Gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Grout (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Pacific VP120 Hinged Door Set -/120/60sm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10 x 75mm Gauge self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10g x 75mm self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 51 mm wall: Max. FRR -/60/30
- 64 mm wall: Max. FRR -/90/30
- 78 mm wall: Max. FRR -/120/30
Integrity rating can be increased by 30 minutes by lining the wall one or both sides, up to a max. of 120 minutes.
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Note: This installation method is only applicable to 78 mm Korok walls
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing 6 sets (i.e. 12 per jamb)
- 10 x 75mm Gauge self tapping screws
Head Fixing (minimum):
- Single door - none required
- Paired door - 1 set
Wedging gap:
- 0 - 15mm
Fire rating for unlined Speedpanel / Korok walls:
- 78 mm wall: Max. FRR -/120/30
Frame has to be filled with plasterboard, ceramic fibre blanket or grout to achieve 30 minute insulation rating.
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Folded steel connection plates (as shown) to be supplied with frames.
- Hook onto frame bracing straps and nail or screw to timber studs.
- Frame connection plates either clouts (30 x 2.5mm gib clouts) or screw fixed.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Framing stud No.1 screwed to jamb.
- Connection to stud No.2 via rebated nail on plates. One fastener per location except at bottom where two fasteners are required.
- Frame to be screw fixed (10g x 50mm self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to stud through Gib Fyreline packing between stud and shims.
- Frame to be screw fixed (10g x 50mm self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frames may be screwed directly to studs either through the stud and into the frame bracing straps or through the frame into the timber stud at 600mm centres minimum.
- Frame to be screw fixed (10g x 50mm self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to stud through Gib Fyreline packing between stud and shims.
- Frame to be screw fixed (10g self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to stud through frame wings
- Frame to be screw fixed (10g x 50mm self tapping) at 600mm nominal centres
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- Ex. 100x50 mm minimum
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (Must be fully grouted frame VP90-120)
Fasteners:
- Jamb fixing at 600mm centres minimum
- Expansion anchors eg. M10 countersunk 'Ramset' Dynabolts
- M12 countersunk masonry screwbolts
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging Gap:
- 0-15mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Boxed stud riveted with steel pop rivets or screwed with self tapping screws to frame bracing straps at 600mm centres minimum.
- Steel studs may be riveted (steel pop rivets) or screwed (9g x 45mm self tapping) to the frame bracing straps.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to boxed stud at 600mm centres minimum with self tapping screws.
- Steel studs may be riveted (steel pop rivets) or screwed (9g x 45mm self tapping) to the frame bracing straps.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to boxed studs with packing steel shims.
- Steel studs may be riveted (steel pop rivets) or screwed (9g x 45mm self tapping) to the frame bracing straps.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging Gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to stud through Gib Fyreline packing between stud and shims.
- Frame to be screw fixed (10g x 50mm self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- 92 x 34mm minimum of 0.55 SMG gauge
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to stud through frame wings
- Frame to be screw fixed (10g x 50mm self tapping) at 600mm nominal centres
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 MSG gauge.
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Pacific VP120-S Sliding Fire Door Set -/120/30
Pacific VP120DA Double Action Door Set -/120/60 SM
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP30-60DA only)
Fasteners:
- Folded steel connection plates (as shown) to be supplied with frames.
- Hook onto frame bracing straps and nail or screw to timber studs.
- Frame connection plates either clouts (30 x 2.5mm gib clouts) or screw fixed.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fixing required
Stud size:
- Ex 100x50mm minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP30-60DA only)
Fasteners:
- Framing stud No.1 screwed to jamb.
- Connection to stud No.2 via rebated nail on plates. One fastener per location except at bottom where two fasteners are required.
- Frame to be screw fixed (10g self tapping) at 600mm centres nominal. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 100x50mm minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP30-60DA ONLY)
Fasteners:
- Frame screwed to stud through Gib Fyreline packing between stud and shims.
- Frame to be screw fixed (10g self tapping) at 600mm centres nominal. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 100x50mm minimum
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP30-60 ONLY)
Fasteners:
- Frames may be screwed directly to studs either through the stud and into the frame bracing straps or through the frame into the timber stud at 600mm centres nominal.
- Frame to be screw fixed (10g self tapping) at 600mm centres nominal. Two fasteners per location where applicable.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- Ex 100x50mm minimum
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP30-60DA ONLY)
Fasteners:
- Frame screwed to stud through Gib Fyreline packing between stud and shims.
- Frame to be screw fixed (10g self tapping) at 600mm centres nominal.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- 90x45mm minimum
Wedging gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP120DA Must be fully grouted frame)
Fasteners:
- Jamb fixing at 600mm centres nominal
- Expansion anchors eg. M10 countersunk 'Ramset' Dynabolts
- M12 countersunk masonry screwbolts
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging Gap:
- 0-15mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP30 & 60 ONLY)
Fasteners:
- Boxed stud riveted with steel pop rivets or screwed with self tapping screws to frame bracing straps at 600mm centres minimum.
- Steel studs may be riveted (steel pop rivets) or screwed (10g self tapping) to the frame bracing straps.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP30 and 60DA ONLY)
Fasteners:
- Frame screwed to boxed stud at 600mm centres nominal with self tapping screws.
- Steel studs may be riveted (steel pop rivets) or screwed (10g self tapping) to the frame bracing straps at 600 centres nominal.
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging gap:
- Not applicable
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm (VP30 and 60DA only)
Fasteners:
- Frame screwed to boxed studs with packing steel shims at 600 centres nominal.
- Steel studs may be riveted (steel pop rivets) or screwed (10g self tapping) to the frame bracing straps at 600 centres nominal.
Head Fixing (minimum):
- Single door - none required
- Paired door - double central fastener required
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging Gap:
- 0-10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Pacific ARMASHIELD-FR Door Set -/120/-
Frame materials available:
- EGZ - 2.0mm
- Cold rolled galvanized - 2.0mm
Fasteners:
- Jamb fixings at 600mm centres nominal
- Expansion anchors eg. M10 countersunk 'Ramset' Dynabolts
- M12 countersunk masonry screwbolts (through adjustable spacer fixing bracket)
Head Fixing (minimum):
- Single door - none required.
- Paired door - single central fastener required.
Wedging Gap:
- 0-10mm
Pacific VP180 Hinged Door Set -/180/60sm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- 10g x 75mm self tapping screws at 600mm centres.
Head Fixings:
- Single door - none required
- Paired door - central fastener required
Stud size:
- ex100 x 50mm.
Wedging Gap:
- N/A
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Jamb fixing at 600mm centres minimum
- Expansion anchors eg. M10 countersunk 'Ramset' Dynabolts
- M12 countersunk masonry screwbolts
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging Gap:
- 10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Pacific VP240 Hinged Door Set -/240/60sm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
- Stainless Steel - 1.5mm
Fasteners:
- Jamb fixing at 600mm centres minimum
- Expansion anchors eg. M10 countersunk 'Ramset' Dynabolts
- M12 countersunk masonry screwbolts
Head Fixing (minimum):
- Single door - none required
- Paired door - single central fastener required
Wedging Gap:
- 10mm
Insulation rating:
To obtain an insulation rating, the steel frame must be packed with either;
- Plasterboard (30 minutes)
- Ceramic fibre blanket (30 minutes)
- Cornice plaster (30 minutes)
- Grout (60 minutes)
- Pyropanel M4 mortar (60 minutes)
No frame packing equals no insulation rating (i.e. -/xx/-)
Pacific VP240-S Sliding Fire Door Set -/240/30
Pacific F0.5-AP Access Panel -/30/30sm
Frame materials available:
- Radiata pine or denser
Architraves:
- Radiata pine (or denser) timber
- Thickness 12mm minimum
Fasteners:
- Frame - Screwed (10g x 50mm self tapping) at 600mm centres and near hinges. Two screws per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Wedging gap:
- 0-10mm
Frame materials available:
- Radiata pine or denser
Architraves:
- Radiata pine (or denser) timber
- Thickness 12mm minimum
Fasteners:
- Frame - Screwed (10g x 50mm self tapping) at 600mm centres and near hinges. Two screws per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Wedging gap:
- 0-10mm
Frame materials available:
- Radiata pine or denser
Architraves:
- Radiata pine (or denser) timber
- Thickness 12mm minimum
Fasteners:
- Frame - Screwed (10g x 50mm self tapping) at 600mm centres and near hinges. Two screws per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Wedging gap:
- 0-10mm
Pacific VP60-AP Access Panel -/60/60
Pacific VP120-AP Access Panel -/120/60
Pacific VP90-FH Fire Rated Floor Hatch -/90/60
Pacific VP120-FH Fire Rated Floor Hatch -/120/60
Pacific FW30-P Fire Window -/30/30
Frame materials available:
- Timber frame, minimum thickness 42mm
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JFB100 at 500mm centres may be used as fixing method to approved walls.
Stud size:
- Ex 75x50 minimum for FW30
- Ex 100x50 minimum for FW60
Wedging gap:
- 0-6mm
Frame materials available:
- Timber frame, minimum thickness 42mm
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres nominal. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JFB100 at 500mm centres may be used to as fixing method to approved walls.
Stud size:
- Ex 75 x 50 minimum for FW30
- Ex 100 x 50 minimum for FW60
Wedging gap:
- 0-6mm
Frame materials available:
- Timber frame, minimum thickness 42mm
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres nominal. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Stud size:
- Ex 75x50 minimum for FW30
- Ex 100x50 minimum for FW60
Wedging gap:
- 0-6mm
Frame materials available:
- Timber frame, minimum thickness 42mm
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres nominal. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave -nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JFB100 at 500mm centres may be used as a fixing method to approved walls.
Stud size:
- Ex 75 x 50 minimum for FW30
- Ex 100 x 50 minimum for FW60.
Wedging gap:
- 0-6mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Folded steel connection plates (as shown) to be supplied with frames.
- Hook onto frame bracing straps and nail or screw to timber studs.
- Frame connection plates either clouts (30 x 2.5mm gib clouts) or screw fixed.
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- Not applicable
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Framing stud No.1 screwed to jamb.
- Connection to stud No.2 via rebated nail on plates. One fastener per location except at bottom where two fasteners are required.
- Frame to be screw fixed (10g x 50mm self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- Not applicable
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to stud through Gib Fyreline packing between stud and shims.
- Frame to be screw fixed (10g x 75mm self tapping) at 600mm nominal centres. Two fasteners per location.
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- 0-10mm
Frame materials available:
- Timber frame, minimum thickness 42mm
Fasteners:
- Frame - M8 or M10 'Ramset' Dynabolts at 600mm centres nominal.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Wedging gap:
- 0-6mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing at 600mm centres nominal
- Expansion anchors eg. M10 countersunk 'Ramset' Dynabolts
- M12 countersunk masonry screwbolts
Wedging Gap:
- 0-10mm
Frame materials available:
- Timber frame, minimum thickness 42mm
Fasteners:
- Frame - Screwed (10g x 50mm self tapping) at 600mm centres nominal. Minimum of one screw per location.
- Frames may also be installed by screw fixing the steel studs to the back of the timber frame during wall construction.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave -nailed (50 x 3.2mm) at 400mm centres.
Stud size:
- 65 x 34mm minimum of 0.55 MSG gauge.
Wedging gap:
- 0-6mm
Frame materials available:
- Timber frame, minimum thickness 42mm
Fasteners:
- Frame - Screwed (10g x 50mm self tapping) at 600mm centres nominal. Minimum of one screw per location.
- Frames may also be installed by screw fixing the steel studs to the back of the timber frame during wall construction.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Stud size:
- 65 x 34mm minimum of 0.55 MSG gauge.
Wedging gap:
- 0-6mm
Frame materials available:
- Timber frame, minimum thickness 42mm
Fasteners:
- Frame - Screwed (10g x 50mm self tapping) at 600mm centres nominal. Minimum of one screw per location.
- Frames may also be installed by screw fixing the steel studs to the back of the timber frame during wall construction.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Stud size:
- 65 x 34mm minimum of 0.55 MSG gauge.
Wedging gap:
- 0-6mm
Pacific FW60-P Fire Window -/60/30
Frame materials available:
- Timber frame, minimum thickness 42mm
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JFB100 at 500mm centres may be used as fixing method to approved walls.
Stud size:
- Ex 75x50 minimum for FW30
- Ex 100x50 minimum for FW60
Wedging gap:
- 0-6mm
Frame materials available:
- Timber frame, minimum thickness 42mm
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres nominal. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JFB100 at 500mm centres may be used to as fixing method to approved walls.
Stud size:
- Ex 75 x 50 minimum for FW30
- Ex 100 x 50 minimum for FW60
Wedging gap:
- 0-6mm
Frame materials available:
- Timber frame, minimum thickness 42mm
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres nominal. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Stud size:
- Ex 75x50 minimum for FW30
- Ex 100x50 minimum for FW60
Wedging gap:
- 0-6mm
Frame materials available:
- Timber frame, minimum thickness 42mm
Fasteners:
- Frame - Either nailed (75 x 3.2mm) or screwed (10g x 75mm) at 600mm centres nominal. Two fixings per location.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave -nailed (50 x 3.2mm) at 400mm centres.
- Pryda Jamb-fixa brackets Type JFB100 at 500mm centres may be used as a fixing method to approved walls.
Stud size:
- Ex 75 x 50 minimum for FW30
- Ex 100 x 50 minimum for FW60.
Wedging gap:
- 0-6mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Folded steel connection plates (as shown) to be supplied with frames.
- Hook onto frame bracing straps and nail or screw to timber studs.
- Frame connection plates either clouts (30 x 2.5mm gib clouts) or screw fixed.
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- Not applicable
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Framing stud No.1 screwed to jamb.
- Connection to stud No.2 via rebated nail on plates. One fastener per location except at bottom where two fasteners are required.
- Frame to be screw fixed (10g x 50mm self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- Not applicable
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to stud through Gib Fyreline packing between stud and shims.
- Frame to be screw fixed (10g x 75mm self tapping) at 600mm nominal centres. Two fasteners per location.
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- 0-10mm
Frame materials available:
- Timber frame, minimum thickness 42mm
Fasteners:
- Frame - M8 or M10 'Ramset' Dynabolts at 600mm centres nominal.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Wedging gap:
- 0-6mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing at 600mm centres nominal
- Expansion anchors eg. M10 countersunk 'Ramset' Dynabolts
- M12 countersunk masonry screwbolts
Wedging Gap:
- 0-10mm
Frame materials available:
- Timber frame, minimum thickness 42mm
Fasteners:
- Frame - Screwed (10g x 50mm self tapping) at 600mm centres nominal. Minimum of one screw per location.
- Frames may also be installed by screw fixing the steel studs to the back of the timber frame during wall construction.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave -nailed (50 x 3.2mm) at 400mm centres.
Stud size:
- 65 x 34mm minimum of 0.55 MSG gauge.
Wedging gap:
- 0-6mm
Frame materials available:
- Timber frame, minimum thickness 42mm
Fasteners:
- Frame - Screwed (10g x 50mm self tapping) at 600mm centres nominal. Minimum of one screw per location.
- Frames may also be installed by screw fixing the steel studs to the back of the timber frame during wall construction.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Stud size:
- 65 x 34mm minimum of 0.55 MSG gauge.
Wedging gap:
- 0-6mm
Frame materials available:
- Timber frame, minimum thickness 42mm
Fasteners:
- Frame - Screwed (10g x 50mm self tapping) at 600mm centres nominal. Minimum of one screw per location.
- Frames may also be installed by screw fixing the steel studs to the back of the timber frame during wall construction.
- Stops - nailed (50 x 3.2mm) at 200mm centres.
- Architrave - nailed (50 x 3.2mm) at 400mm centres.
Stud size:
- 65 x 34mm minimum of 0.55 MSG gauge.
Wedging gap:
- 0-6mm
Pacific FW120 Fire Window -/120/-
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Folded steel connection plates (as shown) to be supplied with frames.
- Hook onto frame bracing straps and nail or screw to timber studs.
- Frame connection plates either clouts (30 x 2.5mm gib clouts) or screw fixed.
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- Not applicable
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Framing stud No.1 screwed to jamb.
- Connection to stud No.2 via rebated nail on plates. One fastener per location except at bottom where two fasteners are required.
- Frame to be screw fixed (10g x 50mm self tapping) at 600mm nominal centres. Two fasteners per location where applicable.
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- Not applicable
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to stud through Gib Fyreline packing between stud and shims.
- Frame to be screw fixed (10g x 75mm self tapping) at 600mm nominal centres. Two fasteners per location.
Stud size:
- Ex 100 x 50 minimum
Wedging gap:
- 0-10mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Jamb fixing at 600mm centres nominal
- Expansion anchors eg. M10 countersunk 'Ramset' Dynabolts
- M12 countersunk masonry screwbolts
Wedging Gap:
- 0-10mm
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to boxed stud at 600mm centres nominal with self tapping screws.
- Steel studs may be riveted (steel pop rivets) or screwed (9g x 45mm self tapping) to the frame bracing straps at 600mm centres nominal.
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging gap:
- Not applicable
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to boxed stud at 600mm centres nominal with self tapping screws.
- Steel studs may be riveted (steel pop rivets) or screwed (9g x 45mm self tapping) to the frame bracing straps at 600mm centres nominal.
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging gap:
- Not applicable
Frame materials available:
- EGZ - 1.6mm
- Cold rolled galvanized - 1.6mm
Fasteners:
- Frame screwed to boxed studs with packing steel shims at 600mm centres nominal.
- Steel studs may be riveted (steel pop rivets) or screwed (9g x 45mm self tapping) to the frame bracing straps at 600mm centres nominal.
Stud size:
- 65 x 34mm minimum of 0.55 SMG gauge
Wedging Gap:
- 0-10mm
Pacific PFP60 Presto Steel Glazed Fire Door Set -/60/-sm
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Pacific PFL60 Fuego-Light Steel Glazed Fire Door Set -/60/30sm
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Pacific PSW60 Presto Steel Fire Window -/60/-
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Note: Projecting sill may be removed for flush appearance, but removal may cause staining under windows from dirt washed off sill.
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Pacific PFW60 Fuego-Light Steel Fire Window -/60/30
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Note: Projecting sill may be removed for flush appearance, but removal may cause staining under windows from dirt washed off sill
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Pacific PFLW60 Fuego-Light Steel Fire Window -/60/60
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Note: Projecting sill may be removed for flush appearance, but removal may cause staining under windows from dirt washed off sill
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Pacific PSW120 Presto Steel Fire Window -/120/-
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Note: Projecting sill may be removed for flush appearance, but removal may cause staining under windows from dirt washed off sill.
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Pacific PFW120 Fuego Steel Fire Window -/120/120
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Note: Projecting sill may be removed for flush appearance, but removal may cause staining under windows from dirt washed off sill
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Pacific PFW30 Fuego-Light Steel Fire Window -/30/30
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Frame materials available:
- Forster extruded profile
Fasteners:
- M8 masonry bolts at 450mm centres maximum
Wedging gap:
- 0-10mm
Note: Projecting sill may be removed for flush appearance, but removal may cause staining under windows from dirt washed off sill
Frame materials available:
- Forster extruded profile
Fasteners:
- 12g screws at 450mm centres maximum
Wedging gap:
- 0-10mm